Long Lead Times Are Common for Many Refractory Manufacturers These Days…Get Your Schedule Back on Track with Plibrico Products From TFL!

June 15, 2021

Don’t Settle for Extended Deliveries – Plibrico is Keeping Our Customers Happy in Today’s Unusual Market. Here’s How:

As industries continue to recover from COVID-19 impacts, supply chain delays have become more prevalent in our industry, making it harder for many refractory companies to meet the urgent demands of their customers. Fortunately, Plibrico prepared and stayed ahead of the curve. While other companies minimized their inventories in 2020 in response to reduced demand, Plibrico did not. Instead, Plibrico strategically invested in raw material inventory to meet anticipated growth in demand. Plus, Plibrico has committed orders with suppliers for additional raw materials to support further near-term increases in production demands. 

 

Since the beginning of our partnership with Plibrico, in 1982, TFL has consistently ranked among Plibrico’s largest distributors in the organization, and we are proud to offer Plibrico refractories to our valued customers. Let us help you overcome supply chain inefficiencies prevalent in our industry today and meet your scheduling needs with Plibrico refractories available at TFL! 

Click here to view our Plibrico product listings and contact us today to discuss your next project

TFL HyFIBER Precast Shapes
July 27, 2026
When high temperatures are combined with severe impact, mechanical loading, and thermal cycling, conventional refractory solutions can be pushed to their limits. HyFIBER Precast Shapes are engineered specifically for these demanding environments. […]
February 4, 2026
Expanding Precast Manufacturing and Refractory Solutions Across Texas and Southern U.S. 
manufacturing precast shapes
By Pamela Gaul • May 25, 2023
Details in Precast Refractory Shapes
Common Refractory Installation Mistakes
By Pamela Gaul • May 16, 2023
When it comes to refractory installation, there are many things that can go wrong. Refractories are a crucial part of many industrial processes, and even small installation mistakes can lead to significant problems down the line. That’s why it’s essential to get it right the first time. Here is a look at some of the most common refractory installation mistakes and how to avoid them.
Plibrico refractory materials
By Pamela Gaul • March 21, 2023
We Are a Major Distributor for Plibrico Company LLC.
refractory shape and material vendor
By Pamela Gaul • March 1, 2023
When looking at multiple precast refractory vendors do your research
precast refractory shapes
By Pamela Gaul • April 19, 2022
The East Bay Municipal Utility District (EBMUD) Wastewater Treatment Plant, located on the eastern shore of San Francisco Bay, provides service for an estimated 740,000 people in the greater Oakland, California area. In addition to traditional wastewater treatment, the plant also collects and treats solid waste from Bay Area food and animal processing facilities, restaurants, and wineries, diverting this waste stream away from landfills. The methane gas that is generated from the decomposition of this solid waste is then used internally as a renewable source of energy to help supply the treatment plant’s energy needs. When EBMUD began looking for a way to upgrade the failing brick refractory lining in their emergency digester gas flare structure, they turned to TFL, Incorporated. TFL developed an innovative precast refractory shape system that would offer dependable performance, structural integrity, and ease of installation. The unique system of floating wall panels is held in place using tongue-and-groove tieback shapes, bolted to the existing concrete structure. The individual panels in the system can absorb thermal and mechanical stresses independently. Given the location, potential seismic loading was also considered in the development of the system. The existing flare containment building is an oval-shaped concrete structure, with inside dimensions of 17’ wide by 47’ long. The refractory lined upper section of the structure is just over 21’ tall. The refractory wall thickness is 4-1/2”. A 2” air gap between the refractory wall and the concrete wall allows for airflow and ventilation. The refractory wall system consists of 514 precast shapes of four basic types, all manufactured in TFL’s Houston, Texas facility. The shapes were cast using Plicast HyMOR 3000 KK, a low-cement castable refractory manufactured by Plibrico Company. Stainless steel needle fibers were used for added reinforcement and to improve resistance to thermal shock and cracking. The shapes were fired to 1250o F prior to shipment, optimizing strengths and allowing the flare structure to be immediately operational, without the need for a field dry out of the refractory. NTK Construction, Inc. of San Francisco, California, was the installation contractor for EBMUD.
refractory repair service tech
By Pamela Gaul • October 12, 2021
Mistakes happen, but here's a few that are can be avoided now, so you don't have to pay now.
precast shapes
By Pamela Gaul • June 15, 2021
Over the years, the refractory industry has faced many challenges. Precast-shape technology has helped us overcome some of them. The technology is used across different industries to produce better results and save money. If you choose to work with refractory castables, the process needs to be perfect. The physical properties of the material are sometimes weakened during the manufacturing stages by several factors. It’s even more crucial to get it right when the complexity increases to secure the performance of the lining. You can take full advantage of a castable’s physical properties by casting precast shapes in a controlled environment with experts overseeing the whole process. When it comes to drying and firing a refractory castable, you want the best lining production. Precast shapes allow you to ensure that the bake-out schedule recommended by manufacturers is followed to the tee since they can be fired in a digitally-controlled furnace. The shapes can also be fired from all sides, reducing moisture and giving off a uniform look that diminishes cracks. Additionally, the lining is less susceptible to stress, and its performance is more predictable. Precast-shape technology has many benefits, and you should take advantage of it. If you’re ready to use precast shapes to optimize your next project, contact us today to learn more about how we can help you.
precast refractory shapes
By Mansfield • May 13, 2021
Minimize Downtime And Increase Performance With Precast Refractory Solutions from TFL!  Precast Refractory Shapes can be used for a wide range of applications and industries ranging from foundry and boiler applications to petrochemical and refinery industries. Regardless of your industry or application, we have the expertise necessary to custom-manufacture durable precast shapes to meet your […] The post Durable Precast Refractory Shapes Manufactured To Your Exact Specifications. appeared first on Refractory Materials, Precast Shapes, and Custom Solutions.